Yes. If the property sits inside our build radius, we evaluate the lot, design the home to it, pull permits, and build.
We take land you control and carry the project from the first site walk to the final walkthrough. You bring the lot; we handle site evaluation, plan fit, permitting, construction, and warranty.
Most county building-permit applications in our area turn around in two to three weeks. Unincorporated county work is generally faster and less expensive than municipal work. City of Houston, Conroe, Huntsville, and Tomball jobs take longer and often add $5,000+ in permitting costs.
Yes. Bring the plan. We will review the specifications, check that it fits the lot setbacks and your budget, and adjust the layout as needed.The timeline depends on design complexity, permitting, and construction scope. Most projects include several weeks of planning followed by a structured construction schedule that we outline clearly from the beginning.
Construction averages 210 days from start to delivery. Because design, documents, financing, and permitting happen prior to breaking ground, the full calendar time from first agreement to move-in commonly falls in the 9-to-14-month range.
Typical lot preparation beyond our included scope runs $20,000 to $30,000. Longer driveways and imported fill for sloped lots usually drive this cost up. A sloped lot down to water (like a lake lot) can require pier-and-beam foundations, adding $65,000 to $120,000.
Additionally, municipal builds often add $5,000+ in permitting and $3,000 to $6,000 in extra building practices required by the city.